Heavy Engineering & Machinery

Our Engineering Verticals

Explore New Super Engineering Works’ 14 specialized manufacturing divisions delivering shotcrete sprayers, colloidal grouting plants, surge shaft formwork, dam shuttering, tunnel lining gantries, high-pressure pipelines, and geotechnical equipment.

Shotcrete & Guniting Machines
Vertical 01

Shotcrete & Guniting Machines

Heavy-duty rotor-type shotcreting and guniting machine (Super W/S-263) engineered for tunnel primary lining, rock slope stabilization, mining cross-cuts, and refractory concrete spraying with continuous uniform flow and minimal rebound.

Key Capabilities:
  • NSEW Super W/S-263 Rotor-Type Shotcrete Machine
  • Dry & Semi-Wet Pneumatic Mortar Guniting Units
  • Underground Tunnel Primary Support Spraying Equipment
Super Grouting Pumps
Vertical 02

Super Grouting Pumps

Integrated high-shear colloidal grout mixer and injection pump plant engineered for low water-cement ratio non-bleed slurries, rock consolidation, dam curtain grouting, and tunnel backfill injection.

Key Capabilities:
  • Super Grout Colloidal High-Shear Mixing Units
  • High-Pressure Piston & Progressive Cavity Injection Pumps
  • Dam Curtain Grouting & Foundation Consolidation Plants
NSEW Jump Shuttering & Sleeve Shuttering for Surge Shaft
Vertical 03

NSEW Jump Shuttering & Sleeve Shuttering for Surge Shaft

1. Sleeve Shutter for Surge Shaft: A circular formwork system used for concrete lining of surge shafts. It maintains the required diameter and concrete thickness during casting. 2. Jump Shutter for Surge Shaft: A vertical climbing formwork system used for shaft lining in stages. After each concrete pour, the shutter is lifted to the next level for further casting.

Key Capabilities:
  • Modular Climbing Jump Formwork for Vertical Surge Shafts
  • Full-Round Continuous Sleeve Shuttering Systems
  • Penstock & Pressure Shaft Concrete Lining Steel Molds
NSEW Hydraulic Tunnel Gantries
Vertical 04

NSEW Hydraulic Tunnel Gantries

Custom fabricated full-round, horseshoe, and D-shaped hydraulic tunnel lining gantries with motorized rail traveler bogies, multi-ram hydraulic power packs, inspection windows, and automated stripping mechanisms.

Key Capabilities:
  • Hydraulic Horseshoe & D-Profile Tunnel Lining Gantries
  • Full-Round (360°) Circular Invert & Crown Lining Gantries
  • Motorized Rail Bogie Travelers with Dual Flanged Steel Wheels
NSEW Mechanical Gantries
Vertical 05

NSEW Mechanical Gantries

Rugged, heavy-duty tunnel lining formwork systems operated by high-capacity mechanical screw jacks and turnbuckles for dependable concrete lining in remote tunnel sites.

Key Capabilities:
  • Mechanical Horseshoe & Semi-Circular Tunnel Lining Gantries
  • Heavy Acme-Thread Screw Jacks & Ratchet Actuators
  • Cut-and-Cover Culvert & Canal Conduit Formwork Gantries
NSEW Dam Shuttering Systems
Vertical 06

NSEW Dam Shuttering Systems

Heavy-duty cantilever climbing formwork engineered for mass concrete casting in gravity dams, spillways, and barrage piers without through-tie rods.

Key Capabilities:
  • Cantilever Climbing Dam Formwork Systems (Tie-Rod Free)
  • Single-Sided Shuttering for Spillways & Barrage Piers
  • Heavy-Duty Formwork Climbing Brackets & Pivot Shoes
NSEW Tunnel Gantry Transitions
Vertical 07

NSEW Tunnel Gantry Transitions

Custom-engineered variable-geometry steel shuttering gantries built to cast complex tunnel sections that taper, expand, or transition between horseshoe, circular, and cavern profiles.

Key Capabilities:
  • Variable-Profile Horseshoe-to-Circular Transition Gantries
  • Bifurcation & Wye-Branch Tunnel Steel Shuttering Forms
  • Telescopic Segmental Skin Plate Assemblies
Super Concrete Pipelines
Vertical 08

Super Concrete Pipelines

Concrete pipelines and clamps.

Key Capabilities:
  • Seamless High-Pressure Concrete Delivery Pipes (DN100, DN125, DN150)
  • Induction Hardened Twin-Wall & Single-Wall Abrasion Pipes
  • Heavy-Duty Forged Quick-Action Snap Clamps & Wedge Couplings
Super Injection Packers
Vertical 09

Super Injection Packers

Precision-machined mechanical and inflatable high-pressure grouting packers engineered for geological fissure sealing, curtain grouting, water stop injection, and rock anchor consolidation.

Key Capabilities:
  • Heavy-Duty Mechanical Expansion Borehole Packers
  • Single & Straddle (Double) Inflatable Wireline Packers
  • Dam Curtain Grouting Lances with Full-Bore Ball Valves
Super Bolts
Vertical 10

Super Bolts

Industrial-grade forged high-tensile formwork tie rods, precision taper bolts, anchor rods, and climbing form fasteners engineered for extreme shear and tensile loads in heavy concrete civil structures.

Key Capabilities:
  • Heavy-Duty Forged Formwork Taper Tie Bolts
  • High-Tensile Coarse-Threaded Through Tie Rods (15mm, 20mm, 26.5mm)
  • Cast Wing Nuts, Flange Plate Nuts & Water-Stop Connectors
Super Rotary Airlocks
Vertical 11

Super Rotary Airlocks

Precision-machined rotary airlock feeder valves engineered for controlled bulk material discharge and pressure-tight pneumatic conveying.

Key Capabilities:
  • Precision Heavy-Duty Industrial Rotary Airlock Valves
  • Stainless Steel (SS304 / SS316) Sanitary & Chemical Rotary Feeders
  • Drop-Through & Blow-Through Pneumatic Conveying Airlocks
NSEW Gantry Spare Parts
Vertical 12

NSEW Gantry Spare Parts

Comprehensive OEM spare parts, precision-rolled replacement skin plates, heavy motorized rail bogie wheel sets, hydraulic cylinders, and screw jacks for tunnel formwork gantries.

Key Capabilities:
  • Motorized Double-Flanged Forged Steel Gantry Rail Wheels
  • High-Pressure Double-Acting Hydraulic Lifting & Retraction Rams
  • Heavy-Duty Acme Thread Mechanical Screw Jacks & Bronze Bushings
NSEW Pile Shuttering
Vertical 13

NSEW Pile Shuttering

Heavy-gauge modular cylindrical steel formwork engineered for large-diameter bored cast-in-situ piles, bridge piers, viaduct columns, and deep marine foundation casing shuttering.

Key Capabilities:
  • Modular Heavy Steel Circular Pile Shuttering (Semi-Round & Quadrant)
  • Bridge Pier & Metro Elevated Viaduct Column Formwork
  • Marine Foundation & Well Steining Permanent/Temporary Casing Forms
Super Electrical Jumboos Traveller
Vertical 14

Super Electrical Jumboos Traveller

Self-propelled motorized electric multi-deck underground tunnel jumbo traveller gantry equipped with wide working decks, high portal clearance, and heavy rail drives for drilling, rebar, and waterproofing works.

Key Capabilities:
  • Motorized Electric Tunnel Jumbo Travellers with Variable Speed Bogies
  • Multi-Tier Suspended & Cantilevered Rebar Fixing Platforms
  • High-Clearance Portal Frames Allowing Uninterrupted Transit Beneath