Lay-By Tunnel Gantry Manufacturing & Erection
Uttarakhand (RVNL Project)
Completed
Quantity: 2 Units
NSEW Hydraulic Tunnel Gantries

Lay-By Tunnel Gantry Manufacturing & Erection

Lay-by gantry manufactured and erected in Uttarakhand RVNL projects. Custom engineered wide-span turnout gantry for broad-gauge railway tunnels.

Main Tunnel Lining Gantry Manufacturing & Erection
Uttarakhand (RVNL Project)
Completed
Quantity: 2 Units
NSEW Hydraulic Tunnel Gantries

Main Tunnel Lining Gantry Manufacturing & Erection

Main tunnel gantry manufactured and erected in Uttarakhand RVNL projects. Full-profile self-propelled motorized shuttering gantry for rapid lining cycles.

Dam Pier Shutters Manufacturing & Erection
Assam, Arunachal Pradesh & J&K
Completed
Assam: 500 | Arunachal: 200 | J&K: 350
NSEW Dam Shuttering Systems

Dam Pier Shutters Manufacturing & Erection

Dam pier shutters manufactured & erection in Assam (500 qty), Arunachal Pradesh (200 qty) and Jammu & Kashmir (350 qty) for major spillways and barrage piers.

CP Collar Shuttering Supply & Erection
Uttarakhand (RVNL Project)
Completed
Quantity: 4 Units
NSEW Tunnel Gantry Transitions

CP Collar Shuttering Supply & Erection

CP collar supplied and erected in Uttarakhand RVNL project. Precision heavy steel collar shuttering arches with structural portal support towers.

Heavy Tunnel Gantry Shutter Supply
Jammu & Kashmir
Completed
Quantity: 2 Units
NSEW Hydraulic Tunnel Gantries

Heavy Tunnel Gantry Shutter Supply

Gantry shutter manufactured and supplied in Jammu & Kashmir. High-tensile curved skin panels and rigid waler truss frameworks for deep mountain tunnels.

Mechanical Tunnel Gantry Supply & Erection
Himachal Pradesh
Completed
Quantity: 3 Units
NSEW Mechanical Gantries

Mechanical Tunnel Gantry Supply & Erection

Mechanical gantry manufacture, supplied and erected in Himachal Pradesh. High-tonnage acme screw-jack actuation system with rail traveler portal frame.

Mechanical Circular Gantry Erection & De-Erection
Uttarakhand
Completed
Quantity: 2 Units
NSEW Mechanical Gantries

Mechanical Circular Gantry Erection & De-Erection

Mechanical circular gantry manufactured erected and de-erected in Uttarakhand. 360-degree full-round modular cylinder lining formwork for water conduits.

Gantry Transitions Supply, Erection & De-Erection
Uttarakhand
Completed
Quantity: 10 Units
NSEW Tunnel Gantry Transitions

Gantry Transitions Supply, Erection & De-Erection

Gantry transitions manufacturer supplied erected and de-erected in Uttarakhand. Turnkey execution of 10 variable-profile transition lining formworks.

18m Diameter Surge Shaft Jump & Sleeve Shuttering System
Pumped Storage Hydroelectric Project
Completed
NSEW Jump Shuttering & Sleeve Shuttering for Surge Shaft

18m Diameter Surge Shaft Jump & Sleeve Shuttering System

Design, precision rolling, trial mock-up pre-assembly, and supply of modular steel climbing jump formwork with multi-tier suspended working decks.

Hydraulic Tunnel Lining Gantry System (10.5m Horseshoe)
Northern Railway Broad Gauge Tunnel Package
Completed
NSEW Hydraulic Tunnel Gantries

Hydraulic Tunnel Lining Gantry System (10.5m Horseshoe)

Fabrication of curved skin plates, traveler portal frame, multi-cylinder hydraulic power unit, and motorized bogie traveler drive for rapid 24-hr lining cycles.

Heavy Mechanical Formwork Arch Gantry with Screw Jacks
Water Conductor & Irrigation Canal Tunnel Project
Completed
NSEW Mechanical Gantries

Heavy Mechanical Formwork Arch Gantry with Screw Jacks

Fabrication of heavy mechanical shuttering gantry actuated with high-tonnage acme-thread screw jacks, turnbuckle alignment struts, and rail traveler.

High-Lift Cantilever Dam Shuttering System Supply
Hydroelectric Dam & Spillway Project, Uttarakhand
Completed
NSEW Dam Shuttering Systems

High-Lift Cantilever Dam Shuttering System Supply

Design, heavy fabrication, and supply of cantilever climbing dam shuttering brackets, walers, push-pull alignment spindles, and working decks for mass concrete pours.

Bifurcation & Profile Transition Tunnel Gantry
Underground Rail Transit & Cavern Package
Completed
NSEW Tunnel Gantry Transitions

Bifurcation & Profile Transition Tunnel Gantry

Engineering and manufacturing of variable-profile transition gantry with telescopic skin panels for horseshoe-to-circular tunnel junction lining.

High-Pressure Heavy Concrete Delivery Pipeline Setup
Deep Shaft & Tunnel Headworks Package
Completed
Super Concrete Pipelines

High-Pressure Heavy Concrete Delivery Pipeline Setup

Manufacture and delivery of 125mm high-pressure seamless slickline concrete delivery pipes, induction hardened bends, and forged snap clamps.

Heavy Mechanical Rock Injection Packers Deployment
Dam Foundation Curtain Grouting & Seepage Cutoff
Completed
Super Injection Packers

Heavy Mechanical Rock Injection Packers Deployment

Batch supply of mechanical expansion injection packers with high-pressure ball valves and vulcanized rubber sleeves for 100+ bar curtain grouting.

Forged High-Tensile Formwork Tie Bolts & Taper Rods
Expressway Cut & Cover Tunnel Project
Completed
Super Bolts

Forged High-Tensile Formwork Tie Bolts & Taper Rods

Production and supply of high-tensile 42CrMo4 alloy taper bolts and acme-threaded tie rods for heavy wall formwork hydrostatic pressure resistance.

Stainless Steel Industrial Rotary Airlock Feeder Valves
Tunnel Shotcrete Batching & Cement Silo Plant
Completed
Super Rotary Airlocks

Stainless Steel Industrial Rotary Airlock Feeder Valves

Custom manufacture of CNC precision-machined rotary airlock valves with outboard bearings and air purge seals for continuous pressure pneumatic conveying.

Tunnel Shuttering Gantry Fleet Overhaul & Spares
Trans-Himalayan Tunneling Package
Completed
NSEW Gantry Spare Parts

Tunnel Shuttering Gantry Fleet Overhaul & Spares

Fabrication and supply of replacement forged double-flanged rail wheels, high-pressure hydraulic rams, acme screw jacks, and CNC curved skin panels.

Large-Diameter Cylindrical Steel Pile Shuttering Casing
River Bridge & Elevated Metro Viaduct Project
Completed
NSEW Pile Shuttering

Large-Diameter Cylindrical Steel Pile Shuttering Casing

Design and fabrication of modular 2.5m diameter circular steel pile formwork with circumferential ring stiffeners and machined joint flanges.

Electric Motorized Underground Tunnel Jumbo Traveller
High-Altitude Hydroelectric Head-Race Tunnel
Completed
Super Electrical Jumboos Traveller

Electric Motorized Underground Tunnel Jumbo Traveller

Manufacturing and on-site commissioning of self-propelled motorized multi-deck working jumbo gantry with variable speed drive and transit envelope.